Evolution

Generated 2026-08-07T15:25:57.594363Z

2063
Total commits
2026-07-01
First commit
11
Shadow runs
32
Scorecard days

Capability Milestones

Major factory capability additions, in chronological order. Each milestone represents a shipped tranche of the Edoworks control-room redesign (ECR-001).

2026-08-06
Foundation Tranche A shipped

Blog migration from Foculoom to Edoworks (28 posts). Foculoom consolidated to corporate operator.

2026-08-07
Data Contracts Tranche B1 shipped

Telemetry schema extended with workflow_class, delivery_lane, session_id. 4 new data contracts (scorecard, interventions, daily-costs, operating-costs).

2026-08-07
Visual System Tranche C shipped

Dark graphite token system for factory dashboards. Light tokens for public homepage. WCAG AA contrast validator. Locally-hosted Inter Variable font.

2026-08-07
Emitter Behavior Tranche B2 shipped

Emitter populates B1 fields. Factory-review PASS verdict linkage replaces commit-subject proxy. Lights-out aggregator + intervention ledger.

2026-08-07
Recovery + Maturity Tranche B3 shipped

Recovery-time script (23 events). Maturity engine with 6-dimension min() gate in shadow mode. Scorecard strict schema conformance.

2026-08-07
Homepage + Control Room Tranche D shipped

Light homepage redesign. Dark /factory/ control room with rolling 28-day median autonomy chart. /factory/maturity/ and /factory/architecture/ pages.

2026-08-07
Portfolio Surface Tranche E (partial) shipped

Richer portfolio cards with outcome, availability, KPI. Per-product detail pages with structured sections.

2026-08-07
Receipts + Experiments + Evolution Tranche E (in progress)

Per-product factory receipts with source attribution. Experiment registry. Evolution timeline. Metrics are factory-wide (no per-product telemetry yet).

Maturity Shadow History

Maturity engine shadow-mode computations. The aggregate level is min() across 6 dimensions. NOT COMPUTABLE until all dimensions are instrumented and fresh.

2026-08-07
NOT COMPUTABLE
3/6 dimensions fresh
2026-08-07
NOT COMPUTABLE
5/6 dimensions fresh
2026-08-07
NOT COMPUTABLE
5/6 dimensions fresh
2026-08-07
NOT COMPUTABLE
5/6 dimensions fresh
2026-08-07
NOT COMPUTABLE
5/6 dimensions fresh
2026-08-07
NOT COMPUTABLE
5/6 dimensions fresh
2026-08-07
NOT COMPUTABLE
5/6 dimensions fresh
2026-08-07
NOT COMPUTABLE
5/6 dimensions fresh
2026-08-07
NOT COMPUTABLE
5/6 dimensions fresh
2026-08-07
NOT COMPUTABLE
5/6 dimensions fresh
2026-08-07
NOT COMPUTABLE
5/6 dimensions fresh

Product Lifecycle Transitions

Key product availability transitions — App Store states and factory rebuild milestones.

2026-07-07
Veilsort

Historically READY_FOR_SALE (v1.0, v1.0.1, v1.1.0), then removed from store

2026-07-07
Vorynce

Factory build v0.0.1 never uploaded; prior non-factory v1.0 DEVELOPER_REJECTED

2026-07-12
Skiplet

v2.0.0 DEVELOPER_REJECTED (submitted without TestFlight validation)

2026-07-19
Veilsort

v2.0.0 + v2.1.1 both READY_FOR_SALE (factory rebuild launched)

2026-08-02
Vorynce

v0.0.1 resubmitted to App Store review (build 20260802.1)

2026-08-05
Veilsort

v2.1.2 WAITING_FOR_REVIEW with IAPs attached for first time

Scorecard History (recent)

Daily scorecard values — autonomy ratio, cost, and recovery time. Missing values shown as —.

DateAutonomyCost/dayRecovery
2026-07-2912.3NOT INSTRUMENTEDNOT INSTRUMENTED
2026-07-3013.6NOT INSTRUMENTEDNOT INSTRUMENTED
2026-07-3120.8NOT INSTRUMENTEDNOT INSTRUMENTED
2026-08-018.2NOT INSTRUMENTEDNOT INSTRUMENTED
2026-08-0234.4NOT INSTRUMENTEDNOT INSTRUMENTED
2026-08-0347.7NOT INSTRUMENTEDNOT INSTRUMENTED
2026-08-0415.0NOT INSTRUMENTEDNOT INSTRUMENTED
2026-08-0520.3NOT INSTRUMENTEDNOT INSTRUMENTED
2026-08-06NOT INSTRUMENTEDNOT INSTRUMENTEDNOT INSTRUMENTED
2026-08-07NOT INSTRUMENTEDNOT INSTRUMENTEDNOT INSTRUMENTED